The project involved integrating both modern and legacy-based laboratory equipment into the LIMS (Laboratory Information Management System). While new equipment could be connected via standardized APIs or modern protocols, the integration of older hardware required dedicated interface solutions, often based on SFTP transfers, file monitoring, or manual triggers.
The data was prepared, validated, and then transferred to central databases. These fed, among other things, dashboards in Power BI and the central ERP system based on Oracle.







